Meeting Information
Meeting Type: | Planning Board |
Date/Time: | Wednesday September 7, 2022 @ 7:00 PM |
Place: | Town Hall |
File Listing
- View Agenda
- View Minutes
- SUMMERVILLE WAY LLC RESPONSE LETTER 8-23-22.PDF
- SUMMERVILLE WAY HOLDINGS LLC SUBDIVISION PLAN 8-23-22.PDF
- SUMMERVILLE WAY HOLDINGS LLC SPEED STUDY 8-23-22.PDF
- SUMMERVILLE WAY HOLDINGS LLC DOT EMAIL 8-23-22.PDF
- HAMLING - SITE PLAN APPLICATION 8-17-22.PDF
- HAMLING - SITE PLAN 8-17-22.PDF
- T-MOBILE CO-LOCATION SITE PLAN 8-23-22
- BLACK MEADOW CROSSING NARRATIVE - 8-15-22.PDF
- ARX WIRELESS GENERATOR W_ BUILT IN TANK 50KW DIESEL OD 8-25-22.PDF
- ARX WIRELESS TOWER STRUCTURAL DESIGN 8-25-22.PDF
- BLACK MEADOW CROSSING SITE PLAN 7-5-22.PDF
- ARX WIRELESS UPDATED FAA DETERMINATION OF NO HAZARD 8-25-22.PDF
- 193 BMD LLC SITE PLAN 08-24-2022.PDF
- 193 BMD LLC - ARCHITECTURAL PLAN 193 BLACK MEADOW ROAD 8-24-22.PDF
- 193 BMD LLC SWPPP 7-13-2022.PDF
- 193 BMD LLC CORRESPONDENCE - PLANNING BOARD SUPERIO-SEPTIC SYSTEM 07-18-2022.PDF
- NY SOLAR 1001 LLC - SITE PLANS 8-15-22.PDF
- T MOBILE - CO-LOCATION SITE PLAN APPLICATION 8-24-22.PDF
- T MOBILE - CO-LOCATION SHORT EAF PT 1 8-24-22.PDF
- T MOBILE - CO-LOCATION 1_6100 WIRELESS FACILITY MODIFICATIONS 8-24-22.PDF
- T MOBILE - CO-LOCATION TANK COMPARATIVE ANALYSIS RPT 8-24-22.PDF
- T MOBILE - CO-LOCATION ANTENNA SITE FCC RF ASSES & REPORT 8-24-22.PDF
- BLACK MEADOW CROSSING FUSCO REVIEW LETTER 9-6-22.PDF
- T MOBILE - FUSCO REVIEW LETTER 9-7-22.PDF
- NY SOLAR 1001 LLC - FUSCO REVIEW LETTER 9-7-22.PDF
- BLACK MEADOW CROSSING NARRATIVE - 8-15-22(1).PDF
- HAMLING - FUSCO REVIEW LETTER 9-7-22.PDF
- ARX WIRELESS APPLICATION - 6-22-22(3).PDF
- AIROSMITH - AT&T - SITE PLAN APPLICATION 8-24-22.PDF
- AIROSMITH - AT&T - ZONING DRAWINGS 8-24-22.PDF
- ARX WIRELESS - USFWS SPECIES LIST 8-15-22.PDF
- ARX WIRELESS NOISE LETTER 8-15-22.PDF
- AIROSMITH - AT&T - SHORT EAF PT1 8-24-22.PDF
- AIROSMITH - AT&T - RF REPORT 8-24-22.PDF
- ARX WIRELESS- USFWS RESOURCE LIST 8-15-22.PDF
- ARX WIRELESS EQUIPMENT REMOVAL ESTIMATE 8-15-22.PDF
- AIROSMITH - AT&T - PROJECT NARRATIVE 8-24-22.PDF
- AIROSMITH - AT&T - FCC COMPLIANCE REPORT -8-24-22.PDF
- AIROSMITH - AT&T - EXHIBIT 2 - MAP 1 NEIGHBORING COVERAGE 8-24-22.PDF
- AIROSMITH - AT&T - EXHIBIT 4 - MAP 3 PROPOSED SITE COVERAGE 8-24-22.PDF
- AIROSMITH - AT&T - EXHIBIT 5 -SITE LIST 8-24-22.PDF
- AIROSMITH - AT&T - SITE PLAN 8-24-22(1).PDF
- CAPELLI SPORTS - SITE PLAN APPLICATION 8-22-22.PDF
- AIROSMITH - AT & T SITE PLAN.PDF
- AIROSMITH - AT&T - EXHIBIT 3 - MAP 2 PROPOSED COMPOSITE COVERAGE 8-24-22.PDF
- AIROSMITH - AT&T - STRUCTURAL ANALYSIS 8-25-22.PDF
- AIROSMITH - AT&T FAA-1A SURVEY CERTIFICATION 9-1-22.PDF
- AIROSMITH - AT&T FUSCO REVIEW LETTER 9-1-22(1).PDF
- ARX WIRELESS FULL EAF 9-7-22.PDF
- ARX WIRELESS -FUSCO REVIEW LETTER 9-1-22.PDF
- ARX WIRELESS ADDITIONAL VISUAL ANALYSIS _ GOOSEPOND_MTN 9-1-22.PDF